Compact HPL Partitions in Mostakbal City, Cairo
Mostakbal City is arriving all at once. Bloomfields, Sarai and La Vista City are handing over phase after phase, each bringing clubhouses, retail strips, schools and clinics with them. Almost every washroom here is being specified for the first time, on a programme that runs alongside handover dates rather than after them. Cairo House EG supplies and installs compact HPL partitions across the development.

What compact HPL partitions are, and why Mostakbal City projects specify them
Compact HPL is high pressure laminate manufactured as a solid board rather than a decorative face over a soft core. Kraft paper is saturated in phenolic resin and pressed under heat into one dense homogeneous slab, normally 12mm or 13mm for cubicle work. It is self supporting, waterproof throughout and repairable at the fitting rather than the panel.
The pressure here is the handover date. Developers in Mostakbal City are selling phases against delivery commitments, and a clubhouse that cannot open because its washrooms are unfinished is a visible failure. That makes fabrication lead time and delivery reliability part of the specification, not an afterthought once the material is chosen.
The second consideration is what happens after handover. These are facilities a management company will maintain for decades with a small on site team. Standardising the panel and hardware across every clubhouse, gym and retail washroom in a development lets that team carry one spares box and fix a failure the same day, rather than chasing a different supplier for each building.


Panel and hardware specification
| Specification | What we supply for Mostakbal City washrooms |
|---|---|
| Panel thickness | 12mm standard cubicles, 13mm for high traffic and public washrooms |
| Core | Solid phenolic kraft core, waterproof through the full thickness |
| Hardware | Stainless steel 304 hinges, indicator locks, brackets, pilaster shoes, coat hooks |
| Door action | Gravity or spring hinges, self closing, adjustable to open or closed rest |
| Head rail | Anodised aluminium, continuous over the cubicle run |
| Floor fixing | Adjustable stainless feet, levels out uneven screed |
| Typical lead time in Mostakbal City | Eight to twelve working days after approval, phased against handover dates |
| Finishes we move most here | Warm neutrals and woodgrains matching current compound schemes |
Where compact HPL earns its cost in Mostakbal City
Clubhouses and gyms
Compound clubhouses across Bloomfields, Sarai and La Vista City run changing rooms with wet floors daily, which rules out any absorbent core.
Retail strips
The commercial strips serving each phase run public washrooms shared between staff and residents on continuous cleaning rotas.
Schools and nurseries
New schools serving the development move large groups through washrooms in short breaks, loading door edges hardest.
Clinics
Medical practices opening with each phase need seamless non porous surfaces rather than tiled walls with grout joints to keep clean.
Sales and handover centres
Sales centres and handover offices carry visitor washrooms that are effectively part of the sales presentation.
Management and service buildings
Facilities and security buildings run small staff washrooms, easily standardised on one approved detail across the whole development.

What we supply and install in Mostakbal City
Cairo House EG has supplied construction finishing materials in Cairo since 2015 and holds the exclusive Egypt agency for UNISCE compact HPL panels. Everything below is fabricated and fitted by our own teams rather than subcontracted out.
Washroom cubicle systems
Cubicle systems built from solid grade board, so the door edge is the same material as the face and cannot delaminate. See HPL compact cubicle panels.
Raised access flooring
Access floor panels and pedestals installed to the finished floor level agreed at survey. See raised flooring installation.
Corian bathroom surfaces
Solid surface bathroom surfaces with no grout lines and no seams for water to sit in. See solid surface bathrooms.
Wet area shower enclosures
Shower cubicles that sit in standing water daily without swelling, because the panel is waterproof through its thickness. See HPL compact showers.
Panel wall lining
Cladding panels for wet walls, corridors and feature walls, fixed on a concealed rail system. See HPL clad wall panels.
Latch hardware
Latch sets that survive constant use and can be swapped out individually rather than as a whole door. See partition lock range.

Serving Mostakbal City and the eastern corridor
Our workshop is in El Nozha El Gedida in Heliopolis and Mostakbal City sits out on the Cairo Suez axis. We treat work here as planned programme rather than callout, phasing fabrication against your handover dates so panels arrive when the building is ready for them.
On the same corridor we cover Madinaty, Shorouk, Badr City, Rehab, New Cairo and the New Administrative Capital, which means a crew already on the eastern side can reach your site without a separate mobilisation.
Live development sites change weekly. We time the survey to the build rather than the calendar, because measuring before screed and render are complete produces panels cut to a shell that no longer exists. You can also see work we have delivered.

What to expect when you work with us
Most washroom packages fail at measurement, not installation. Our process removes that risk before a single panel is cut.
- Site survey. We measure the built washroom in Mostakbal City rather than working from the drawing, because wall plumb, floor level and drainage falls on site rarely match what was issued.
- Layout and panel selection. You receive a cubicle layout with door swings and clear widths marked, plus physical panel samples so the colour is approved under your own lighting instead of on a screen.
- Quotation. Itemised by panel, hardware and installation, so you can see what is being priced and adjust the specification if the budget needs it.
- Fabrication. Panels are cut, edge finished and drilled to the approved layout. Sheets stay under factory film until they reach site.
- Installation. Our fitters set out, install head rails, pilasters and doors, then adjust every hinge and latch before handover. On phased developments we install building by building against your delivery dates.
- Handover and after sales. We walk the finished washroom with you, hand over spare hardware, and stay reachable for adjustments once the space is in real use.


Find Us on Google Maps
Frequently Asked Questions
Can you phase fabrication against our handover dates? Yes, and on a phased development it is the only sensible way to work. We batch panels against your building release schedule rather than producing everything at once and storing it on a live site where it gets damaged.
We want one specification across every facility in the development. Is that practical? Very. One panel and one hardware set across all clubhouses, retail and school washrooms lets your management company hold a single spares box and repair anything the same day.
When should the survey happen on a building still under construction? After the screed is down and the walls are rendered. Measuring earlier gives panels cut to dimensions that will have moved by the time they arrive.
Our clubhouse changing rooms have a pool. Will the panels handle that? Yes. The board is waterproof through its full thickness and we supply stainless steel 304 fittings, which is the pairing that survives constant humidity and standing water.
Do you supply matching lockers and benches? Yes, fabricated from the same compact HPL, so the changing room and washroom share one specification, one finish and one spares list.
What thickness should a clubhouse or retail washroom use? 13mm for facilities open to residents and the public. 12mm is sufficient for staff and management washrooms and costs less.
How long does fabrication take? Eight to twelve working days after layout and colour approval for programme quantities. We phase batches against your dates so lead time runs in parallel with the build rather than after it.
What does a compact HPL partition cost in Mostakbal City? It depends on thickness, colour, cubicle count and hardware, and volume across a phased development affects the rate. Send the schedule and we return an itemised quotation.
Get a quote for your Mostakbal City project
Send the washroom schedule or the building drawings and we will return an itemised quotation phased against your handover dates.
Site visits to Mostakbal City are planned around your construction programme and gate access. To book a site survey, call or message us any time.
Phone: +201066672094 or +201223111265
Website: cairohouseeg.com
Hours: Open 24 hours, 7 days a week
Address: 3 Misr Lel Tayaran Street, Block 1314, Civil Aviation Buildings, next to Sindbad, El Nozha El Gedida, Cairo 11843
