Compact HPL Partitions in Badr City, Cairo
Badr City is still being built out, which means most of its washrooms are being specified now rather than replaced later. Badr University in Cairo runs a growing campus, the industrial zone carries manufacturing and logistics operations along the Cairo Suez road, and new residential districts are bringing schools, clinics and retail with them. Cairo House EG supplies and installs compact HPL partitions across the city.

What compact HPL partitions are, and why Badr City projects specify them
Compact HPL is high pressure laminate manufactured as a solid slab rather than a laminate face over a soft substrate. Kraft paper is saturated in phenolic resin and pressed under heat into one dense homogeneous board, normally 12mm or 13mm for cubicle work. There is no core to swell and no frame to corrode behind it.
Because Badr is mostly new build, the decision here is a genuine first choice rather than a repair. That is worth taking seriously, because the cost difference between a system that lasts four years and one that lasts fifteen is small at the point of purchase and enormous over the life of the building. Most of the failed washrooms we replace across Cairo were specified by someone saving a modest amount at first fit.
New build brings its own practical issue. Shells here are poured fast and the walls are rarely square or plumb by the time the finishes arrive. A partition system fabricated to the drawing will not fit. Fabricating to the surveyed opening is what keeps door gaps even, and on a new build site that survey has to happen after the screed and render, not before.


Panel and hardware specification
| Specification | What we supply for Badr City washrooms |
|---|---|
| Panel thickness | 12mm standard cubicles, 13mm for high traffic and public washrooms |
| Core | Solid phenolic kraft core, waterproof through the full thickness |
| Hardware | Stainless steel 304 hinges, indicator locks, brackets, pilaster shoes, coat hooks |
| Door action | Gravity or spring hinges, self closing, adjustable to open or closed rest |
| Head rail | Anodised aluminium, continuous over the cubicle run |
| Floor fixing | Adjustable stainless feet, levels out uneven screed |
| Typical lead time in Badr City | Eight to twelve working days after approval |
| Finishes we move most here | Neutral greys and hard wearing solids for new build interiors |
Where compact HPL earns its cost in Badr City
University campus
Badr University in Cairo concentrates heavy use into short breaks between lectures, which loads door edges, hinges and latches rather than the panel face.
Industrial and manufacturing
Plants across the industrial zone run staff washrooms on shift patterns with effectively no recovery period between uses.
Logistics and warehousing
Distribution units along the Cairo Suez road operate staff facilities in dusty conditions where a wipe clean non porous surface is essential.
Schools
New schools serving the residential districts face the same short break pattern as the campus, on a smaller scale.
Clinics
Medical practices opening across the new districts need seamless non porous surfaces rather than tiled walls with grout joints.
Retail and services
Ground floor retail in the new districts runs washrooms shared between staff and customers on continuous cleaning rotas.

What we supply and install in Badr City
Cairo House EG has supplied construction finishing materials in Cairo since 2015 and holds the exclusive Egypt agency for UNISCE compact HPL panels. Everything below is fabricated and fitted by our own teams rather than subcontracted out.
Compact HPL toilet partitions
Complete partition runs cut to your layout, including urinal screens, head rails and adjustable stainless feet. See our HPL compact partition system.
Cubicle door hinges
Hinge sets rated for public washroom traffic, supplied with the fixings and spares your maintenance team will want. See stainless partition hinges.
Levelling feet
Base fittings in stainless 304, so the one part sitting in standing water is the one part that cannot rust. See partition foot covers.
Corian and solid surface
Seamless acrylic solid surface for reception counters, clinical surfaces and food service areas. See the Corian product range.
Solid surface counters
Counter surfaces that take heat, cutting and daily cleaning while staying one continuous colour through the sheet. See solid surface counters.
Changing room lockers
Changing room lockers in matching colours, sized to the bay rather than bought in fixed modules. See panel built lockers.

Serving Badr City and the eastern corridor
Our base is in El Nozha El Gedida in Heliopolis and Badr is a clear run out on the Cairo Suez road. Distance means we plan rather than react, agreeing delivery and installation windows before fabrication starts rather than promising same day attendance.
On the same corridor we cover Shorouk, Obour, Madinaty, Mostakbal City and the New Administrative Capital. A contractor running several eastern sites can hand us the whole package and use one mobilisation.
On live construction sites we time the survey to the build rather than the calendar. Measuring before the screed and render are complete produces panels that do not fit, so we schedule the visit around your programme. You can also see our supply and installation service.

What to expect when you work with us
Most washroom packages fail at measurement, not installation. Our process removes that risk before a single panel is cut.
- Site survey. We measure the built washroom in Badr City rather than working from the drawing, because wall plumb, floor level and drainage falls on site rarely match what was issued.
- Layout and panel selection. You receive a cubicle layout with door swings and clear widths marked, plus physical panel samples so the colour is approved under your own lighting instead of on a screen.
- Quotation. Itemised by panel, hardware and installation, so you can see what is being priced and adjust the specification if the budget needs it.
- Fabrication. Panels are cut, edge finished and drilled to the approved layout. Sheets stay under factory film until they reach site.
- Installation. Our fitters set out, install head rails, pilasters and doors, then adjust every hinge and latch before handover. On new build we go in near the end so panels are not damaged by trades that follow.
- Handover and after sales. We walk the finished washroom with you, hand over spare hardware, and stay reachable for adjustments once the space is in real use.


Find Us on Google Maps
Frequently Asked Questions
When should we survey on a new build site? Once the screed is down and the walls are rendered. Measuring earlier gives you panels cut to a shell that no longer exists by the time they arrive, which is the single most common cause of uneven door gaps.
Is compact HPL worth the extra at first fit compared with laminated board? Over the life of the building, comfortably. The difference at purchase is modest. The difference in outcome is a washroom that still works in year twelve against one that needs full replacement in year four.
Our walls are out of square. Can you still get even door gaps? Yes, provided we fabricate to the surveyed opening rather than the drawing. Out of square shells are normal on fast poured new build and we plan the set out around them.
Can you install while other trades are still on site? We prefer to install near the end of the programme. Partitions are a finish item, and going in early means they take damage from every trade that follows. We agree the sequence with the main contractor.
What thickness should a new university or industrial washroom use? 13mm. Both duties are at the hard end of the range, and the thicker board absorbs impact at the door edge far better across the building life.
Do you supply lockers and changing benches as well? Yes, from the same panel with matching stainless steel 304 fittings, so the changing area and the washroom carry one specification.
How long does fabrication take? Eight to twelve working days after layout and colour approval for programme quantities. Single washrooms turn faster. Colour availability is normally the variable.
What does a compact HPL partition cost in Badr City? It depends on thickness, colour, cubicle count and hardware, and volume affects the rate. Send the drawings or the washroom schedule and we return an itemised quotation.
Get a quote for your Badr City project
Send the drawings or the washroom schedule and we will return an itemised quotation. On live sites we will time the survey to your build programme rather than measuring too early.
Site visits to Badr City are planned around your construction programme and gate access. To contact us to arrange a survey, call or message us any time.
Phone: +201066672094 or +201223111265
Website: cairohouseeg.com
Hours: Open 24 hours, 7 days a week
Address: 3 Misr Lel Tayaran Street, Block 1314, Civil Aviation Buildings, next to Sindbad, El Nozha El Gedida, Cairo 11843
