Compact HPL Partitions in Shoubra El Kheima, Cairo
Shoubra El Kheima is one of the densest industrial districts in Egypt. Factories and workshops run through the industrial zone, the Mostorod refinery sits on its edge, the Ain Shams University Faculty of Agriculture campus is here, and the metro terminus at Khalafawy moves workers in and out all day. Washrooms here run under industrial conditions. Cairo House EG supplies and installs compact HPL partitions across the district.

What compact HPL partitions are, and why Shoubra El Kheima plants need them
Compact HPL is high pressure laminate manufactured as a solid slab rather than a laminate face over a soft substrate. Kraft paper is saturated in phenolic resin and pressed under heat into one dense homogeneous board, normally 12mm or 13mm for cubicle work. It is non porous, waterproof throughout and has nothing inside it that can degrade.
Industrial washrooms are a different specification problem to commercial ones. Workers arrive with oil, dust and process residue on their hands and clothing, cleaning is frequent and chemical, and use runs across shifts with no quiet period. Under that regime a coated finish is stripped, a laminated edge is opened up, and a timber core is saturated within a season.
The other reality is downtime. A plant cannot lose washroom capacity for a week waiting on a supplier, so the system has to be repairable in place by the site maintenance team. Stainless steel 304 hinges, latches and brackets unbolt and swap in minutes, and we leave spares on site precisely so a failure never becomes a production problem.


Panel and hardware specification
| Specification | What we supply for Shoubra El Kheima washrooms |
|---|---|
| Panel thickness | 12mm standard cubicles, 13mm for high traffic and public washrooms |
| Core | Solid phenolic kraft core, waterproof through the full thickness |
| Hardware | Stainless steel 304 hinges, indicator locks, brackets, pilaster shoes, coat hooks |
| Door action | Gravity or spring hinges, self closing, adjustable to open or closed rest |
| Head rail | Anodised aluminium, continuous over the cubicle run |
| Floor fixing | Adjustable stainless feet, levels out uneven screed |
| Typical lead time in Shoubra El Kheima | Eight to twelve working days after approval for plant quantities |
| Finishes we move most here | Dark industrial solids that hide oil, dust and daily marking |
Where compact HPL earns its cost in Shoubra El Kheima
Factories and manufacturing
Plants across the industrial zone run staff washrooms across shifts with process residue, oil and dust carried in on every use.
Refinery and heavy process
The Mostorod area operates under strict cleaning and safety regimes where coated finishes and sealed edges do not survive.
Workshops and light industry
Smaller engineering units face the same conditions on a smaller scale, usually with a single washroom that cannot be taken out of service.
University campus
The Ain Shams University Faculty of Agriculture concentrates use into short breaks between lectures, loading door edges hardest.
Transit and commercial
The Khalafawy metro terminus and the commercial units around it take heavy public use at shift change rather than steadily.
Warehousing and logistics
Distribution units run staff facilities in dusty conditions where a wipe clean non porous panel is the only practical choice.

What we supply and install in Shoubra El Kheima
Cairo House EG has supplied construction finishing materials in Cairo since 2015 and holds the exclusive Egypt agency for UNISCE compact HPL panels. Everything below is fabricated and fitted by our own teams rather than subcontracted out.
Washroom cubicle systems
Cubicle systems built from solid grade board, so the door edge is the same material as the face and cannot delaminate. See our core HPL partition line.
Latch hardware
Latch sets that survive constant use and can be swapped out individually rather than as a whole door. See partition lock range.
Coat hooks and bumpers
Stainless coat hooks and door bumpers, the two small fittings that decide whether a cubicle feels finished. See coat hooks and door bumpers.
Solid surface vanities
Solid surface vanity units built as one continuous piece, which is the detail that makes a washroom easy to clean. See solid surface vanity tops.
Solid surface tables
Table tops in matching colours across a whole venue, fabricated as one batch. See solid surface table tops.
Washroom counter tops
Counter surfaces in the same colour family as the cubicles, so the washroom reads as one specification. See compact counter tops.

Serving Shoubra El Kheima and the northern industrial belt
We are based in El Nozha El Gedida in Heliopolis, which puts Shoubra El Kheima within a straightforward run north. Close enough to keep mobilisation costs sensible on single plant packages, and close enough for a fitter to return for an adjustment without a chargeable trip.
On the same belt we cover Shubra, Rod El Farag, Ain Shams, Obour and Mostorod. Facilities managers running plants across more than one of those usually hand us the full package.
Industrial access rules govern the programme here. Gate passes, safety induction, permit to work systems and restricted delivery windows all get collected at survey so the schedule we quote is one the plant will actually allow. You can also see our company site.

What to expect when you work with us
Most washroom packages fail at measurement, not installation. Our process removes that risk before a single panel is cut.
- Site survey. We measure the built washroom in Shoubra El Kheima rather than working from the drawing, because wall plumb, floor level and drainage falls on site rarely match what was issued.
- Layout and panel selection. You receive a cubicle layout with door swings and clear widths marked, plus physical panel samples so the colour is approved under your own lighting instead of on a screen.
- Quotation. Itemised by panel, hardware and installation, so you can see what is being priced and adjust the specification if the budget needs it.
- Fabrication. Panels are cut, edge finished and drilled to the approved layout. Sheets stay under factory film until they reach site.
- Installation. Our fitters set out, install head rails, pilasters and doors, then adjust every hinge and latch before handover. On plant sites we phase the work so washroom capacity is never fully withdrawn from a running shift.
- Handover and after sales. We walk the finished washroom with you, hand over spare hardware, and stay reachable for adjustments once the space is in real use.


Find Us on Google Maps
Frequently Asked Questions
Workers bring oil and process residue into the washroom. Will the panels stain? No. The surface is non porous and takes industrial cleaning agents without dulling or staining. Dark solid colours are the sensible choice here because they hide daily marking between cleans.
We cannot lose washroom capacity during production. How do you install? We phase the work so a proportion of cubicles stays in service throughout, with the sequence agreed against your shift pattern at survey rather than decided on site.
Can our maintenance team repair failures without calling us out? Yes, and that is how we set the job up. Hinges, latches and brackets are standard stainless steel 304 items that unbolt and swap without touching the panel, and we leave spares on site at handover.
Do you supply lockers and benches for changing rooms? Yes, fabricated from the same compact HPL with matching stainless fittings, so the changing room and washroom carry one specification and one spares list.
What thickness should an industrial washroom use? 13mm. Continuous shift use in a plant environment is the hardest duty a cubicle sees, and the thicker board handles impact at the door edge far better across a long service life.
Can you meet permit to work and safety induction requirements? Yes. We collect the site requirements at survey and submit crew and vehicle details in advance so inductions and permits are in place before the crew arrives.
How long does fabrication take for a plant wide package? Eight to twelve working days after layout and colour approval. We batch against your phasing so installation runs continuously rather than waiting on one large delivery.
What does a compact HPL partition cost in Shoubra El Kheima? It depends on thickness, colour, cubicle count and hardware, and volume affects the rate on plant wide packages. Send the washroom schedule and we return an itemised quotation.
Get a quote for your Shoubra El Kheima project
Send the washroom schedule or the plant layout and we will return an itemised quotation covering the whole package, phased against your shift pattern.
Site visits are planned around gate access, induction and permit requirements. To request a site visit, call or message us any time.
Phone: +201066672094 or +201223111265
Website: cairohouseeg.com
Hours: Open 24 hours, 7 days a week
Address: 3 Misr Lel Tayaran Street, Block 1314, Civil Aviation Buildings, next to Sindbad, El Nozha El Gedida, Cairo 11843
