Compact HPL Partitions in Abbassia, Cairo
Abbassia is institutional Cairo. The Ain Shams University main campus sits here, El Demerdash Hospital runs one of the largest teaching hospital complexes in the country, Saint Mark Cathedral and Al Nour Mosque draw congregations in the thousands, and Abbassia Square keeps traffic moving through all of it. These are washrooms that serve the public at volume. Cairo House EG supplies and installs compact HPL partitions across the district.

What compact HPL partitions are, and why Abbassia institutions specify them
Compact HPL is high pressure laminate manufactured as a solid slab rather than a laminate face over a soft substrate. Kraft paper is saturated in phenolic resin and pressed under heat into one dense homogeneous board, normally 12mm or 13mm for cubicle work. It is non porous through its full thickness with no seams for anything to collect in.
For a hospital that property is the whole argument. El Demerdash and the teaching hospital complex around it clean to clinical standards with disinfectants far stronger than a commercial washroom ever sees. Tiled walls give you grout lines that stain and harbour growth, and coated panels lose their coating. A homogeneous non porous panel has neither weakness.
The university side brings a different demand. Campus washrooms take several hundred people inside a ten minute break between lectures, and that load falls entirely on door edges, hinges and latches. Stainless steel 304 hardware that unbolts and swaps lets a maintenance team fix a failure the same day rather than closing a washroom block.


Panel and hardware specification
| Specification | What we supply for Abbassia washrooms |
|---|---|
| Panel thickness | 12mm standard cubicles, 13mm for high traffic and public washrooms |
| Core | Solid phenolic kraft core, waterproof through the full thickness |
| Hardware | Stainless steel 304 hinges, indicator locks, brackets, pilaster shoes, coat hooks |
| Door action | Gravity or spring hinges, self closing, adjustable to open or closed rest |
| Head rail | Anodised aluminium, continuous over the cubicle run |
| Floor fixing | Adjustable stainless feet, levels out uneven screed |
| Typical lead time in Abbassia | Five to eight working days after approval, phased for large complexes |
| Finishes we move most here | Plain white and light grey for clinical areas, hard solids for campus |
Where compact HPL earns its cost in Abbassia
Teaching hospitals
El Demerdash and the surrounding complex clean to clinical standards, where non porous seamless surfaces outperform tile and grout on every hygiene measure.
University campus
Ain Shams University main campus concentrates several hundred users into short breaks, loading door edges and hardware rather than the panel face.
Places of worship
Saint Mark Cathedral and Al Nour Mosque handle congregation surges, with ablution and washroom facilities in constant wet use.
Clinics and laboratories
The medical practices and labs around the hospital complex need surfaces that tolerate laboratory grade cleaning agents without degrading.
Student facilities
Halls, canteens and libraries across the campus run washrooms with sustained daily use and limited maintenance windows.
Retail and services
Ground floor commercial around Abbassia Square and Ghamra runs washrooms shared between staff and a constant passing public.

What we supply and install in Abbassia
Cairo House EG has supplied construction finishing materials in Cairo since 2015 and holds the exclusive Egypt agency for UNISCE compact HPL panels. Everything below is fabricated and fitted by our own teams rather than subcontracted out.
Compact HPL toilet partitions
Complete partition runs cut to your layout, including urinal screens, head rails and adjustable stainless feet. See compact partition boards.
Hooks and door bumpers
Coat hooks fixed through the panel properly rather than surface stuck, so they survive being leaned on. See cubicle door hooks.
Corian washroom counters
Vanity counters that pair with compact HPL cubicles and hold up to the same cleaning regime. See Corian basin counters.
Corian table tops
Custom table tops for restaurants and cafes, cut to shape and fitted to your chosen bases. See Corian table tops.
Compact HPL worktops
Vanity counters cut from single sheets, with cut outs for basins and taps done in the workshop rather than on site. See solid panel vanity counters.
Cubicle door hinges
Hinge sets rated for public washroom traffic, supplied with the fixings and spares your maintenance team will want. See stainless partition hinges.

Serving Abbassia and the central districts
We are based in El Nozha El Gedida in Heliopolis, roughly twenty minutes from Abbassia depending on the hour. Close enough for a same week survey and for a fitter to return for an adjustment without a chargeable trip.
From the same base we cover Ain Shams, Nasr City, Downtown, Manial and New Nozha, so a project spanning more than one of those runs as a single package.
Hospital and campus work is governed by access rather than distance. Clinical hours, term dates and infection control requirements all shape when work can happen, and we build those into the programme at survey rather than discovering them mid installation. You can also see the full materials catalogue.

What to expect when you work with us
Most washroom packages fail at measurement, not installation. Our process removes that risk before a single panel is cut.
- Site survey. We measure the built washroom in Abbassia rather than working from the drawing, because wall plumb, floor level and drainage falls on site rarely match what was issued.
- Layout and panel selection. You receive a cubicle layout with door swings and clear widths marked, plus physical panel samples so the colour is approved under your own lighting instead of on a screen.
- Quotation. Itemised by panel, hardware and installation, so you can see what is being priced and adjust the specification if the budget needs it.
- Fabrication. Panels are cut, edge finished and drilled to the approved layout. Sheets stay under factory film until they reach site.
- Installation. Our fitters set out, install head rails, pilasters and doors, then adjust every hinge and latch before handover. In hospitals and on campus we phase block by block so facilities are never fully withdrawn.
- Handover and after sales. We walk the finished washroom with you, hand over spare hardware, and stay reachable for adjustments once the space is in real use.


Find Us on Google Maps
Frequently Asked Questions
Is compact HPL acceptable for a hospital washroom? Yes. It is non porous with no seams or grout lines, and it tolerates hospital grade disinfectants without dulling, staining or needing resealing. That combination is difficult to achieve with tiled construction.
Can you work inside clinical hours and infection control requirements? Yes. We agree the working window, access route and any containment requirements at survey, then phase the installation so the department retains washroom capacity throughout.
What thickness should a hospital or campus washroom use? 13mm. Both are among the hardest duties a cubicle faces, and the thicker board absorbs impact at the door edge far better over a long service life.
Our maintenance team needs to repair failures quickly. Is that possible? Yes. Hinges, latches and brackets are standard stainless steel 304 items that unbolt and swap without touching the panel, and we leave spares on site at handover.
Can you handle a phased refurbishment across a large complex? Yes. We fabricate in batches against your phasing schedule rather than delivering everything at once, which keeps panels off a live site until the block is ready.
Do ablution areas need a different specification? Not a different panel, but they are permanently wet, so we pay particular attention to adjustable stainless feet, drainage clearance and fixing detail at the base.
How long does fabrication take for a large complex? Five to eight working days after layout and colour approval for a single washroom, phased in batches for a larger programme so installation runs continuously.
What does a compact HPL partition cost in Abbassia? It depends on thickness, colour, cubicle count and hardware, and volume affects the rate on a complex wide programme. Send the schedule and we return an itemised quotation.
Get a quote for your Abbassia project
Send the washroom schedule or the block drawings and we will return an itemised quotation, phased if the programme needs it. Product documentation is available for consultant submissions.
Site visits across Abbassia are planned around clinical hours and campus access. To talk to us about the project, call or message us any time.
Phone: +201066672094 or +201223111265
Website: cairohouseeg.com
Hours: Open 24 hours, 7 days a week
Address: 3 Misr Lel Tayaran Street, Block 1314, Civil Aviation Buildings, next to Sindbad, El Nozha El Gedida, Cairo 11843
