Compact HPL Partitions in Shorouk City, Cairo
Shorouk City is defined by its campuses. The British University in Egypt and El Shorouk Academy between them move thousands of students through the same buildings every day, and around them sit the Shorouk Club, the commercial strip along the main spine and a growing run of clinics and schools serving the residential districts. Cairo House EG supplies and installs compact HPL partitions across the city.

What compact HPL partitions are, and why Shorouk campuses need them
Compact HPL is high pressure laminate pressed into a solid slab rather than bonded as a thin face over a soft core. Layers of kraft paper are saturated in phenolic resin and fused under heat into one dense homogeneous board, normally 12mm or 13mm for cubicles. The panel is self supporting and waterproof through its full thickness.
University washrooms are the hardest duty in ordinary commercial construction and Shorouk has two campuses running them at scale. Between lectures, several hundred people use the same facilities inside ten minutes. That pattern does not gently wear a washroom, it hammers it, and the damage concentrates entirely on door edges, hinges and latches rather than on the panel face.
Which is why the specification decision here is really about the hardware and the edge. A solid panel means an impact leaves a mark rather than splitting a laminate face off a core, and stainless steel 304 fittings mean a broken latch is a ten minute swap by your own maintenance team rather than a supplier call out and a closed washroom.


Panel and hardware specification
| Specification | What we supply for Shorouk washrooms |
|---|---|
| Panel thickness | 12mm standard cubicles, 13mm for high traffic and public washrooms |
| Core | Solid phenolic kraft core, waterproof through the full thickness |
| Hardware | Stainless steel 304 hinges, indicator locks, brackets, pilaster shoes, coat hooks |
| Door action | Gravity or spring hinges, self closing, adjustable to open or closed rest |
| Head rail | Anodised aluminium, continuous over the cubicle run |
| Floor fixing | Adjustable stainless feet, levels out uneven screed |
| Typical lead time in Shorouk City | Eight to twelve working days after approval for campus quantities |
| Finishes we move most here | Hard wearing solid colours that hide daily marking on campus |
Where compact HPL earns its cost in Shorouk City
Universities
The British University in Egypt and El Shorouk Academy run washroom blocks that see several hundred people inside a ten minute break between lectures.
Schools
The schools serving the residential districts face the same concentrated pattern on a smaller scale, with the same wear on door edges.
Sports and clubs
Shorouk Club changing rooms deal with wet floors as a matter of routine, which rules out any system with an absorbent core.
Clinics
Medical practices across the city need non porous seamless surfaces that pass a hygiene review without relying on grout joints.
Retail and dining
The commercial strip runs public washrooms shared between staff and customers, on continuous cleaning rotas.
Offices and administration
Campus administration buildings and offices repeat small staff washrooms, easily standardised on a single approved detail.

What we supply and install in Shorouk City
Cairo House EG has supplied construction finishing materials in Cairo since 2015 and holds the exclusive Egypt agency for UNISCE compact HPL panels. Everything below is fabricated and fitted by our own teams rather than subcontracted out.
Toilet partition runs
Toilet partitions fabricated to the surveyed dimensions, not to the drawing, which is what keeps door gaps even on site. See HPL compact cubicles.
Corian and solid surface
Seamless acrylic solid surface for reception counters, clinical surfaces and food service areas. See Corian and solid surface work.
Solid surface vanities
Solid surface vanity units built as one continuous piece, which is the detail that makes a washroom easy to clean. See solid surface vanity tops.
Corian washroom work
Bathroom surfaces specified where hygiene audits apply and tiled detailing will not pass. See Corian washroom surfaces.
Reception and bar counters
Countertops repairable in place, which matters over a five to ten year lease. See seamless Corian counters.
Corian table tops
Custom table tops for restaurants and cafes, cut to shape and fitted to your chosen bases. See fabricated Corian tables.

Serving Shorouk City and the eastern corridor
We are based in El Nozha El Gedida in Heliopolis, and Shorouk is a clear run out on the Cairo Ismailia desert road. Far enough that we plan rather than react, so delivery and installation windows are agreed before fabrication begins.
On the same corridor we cover Obour, Badr City, Madinaty, Rehab, Mostakbal City and the New Administrative Capital. Contractors running several eastern sites usually give us the full package.
Campus access rules matter more here than distance. Term dates, examination periods and building access windows all shape when work can happen, and we build them into the programme at survey rather than discovering them later. You can also see other districts we cover.

What to expect when you work with us
Most washroom packages fail at measurement, not installation. Our process removes that risk before a single panel is cut.
- Site survey. We measure the built washroom in Shorouk City rather than working from the drawing, because wall plumb, floor level and drainage falls on site rarely match what was issued.
- Layout and panel selection. You receive a cubicle layout with door swings and clear widths marked, plus physical panel samples so the colour is approved under your own lighting instead of on a screen.
- Quotation. Itemised by panel, hardware and installation, so you can see what is being priced and adjust the specification if the budget needs it.
- Fabrication. Panels are cut, edge finished and drilled to the approved layout. Sheets stay under factory film until they reach site.
- Installation. Our fitters set out, install head rails, pilasters and doors, then adjust every hinge and latch before handover. On campuses we phase block by block so facilities are never entirely closed.
- Handover and after sales. We walk the finished washroom with you, hand over spare hardware, and stay reachable for adjustments once the space is in real use.


Find Us on Google Maps
Frequently Asked Questions
Can you complete a campus washroom programme during the summer break? Yes, and that is the ideal window. We fabricate in batches against your block release schedule so installation runs continuously through the break rather than waiting on a single large delivery.
What thickness should a university washroom use? 13mm without hesitation. Campus washrooms take the most concentrated use of any building type, and the thicker board absorbs impact at the door edge far better across a ten year life.
Our maintenance team wants to fix failures themselves. Is that possible? Yes, and we set the job up for it. Hinges, latches and brackets are standard stainless steel 304 items that unbolt and swap without touching the panel, and we leave spares on site at handover.
Students damage doors. How does compact HPL handle abuse? Far better than a laminated system. Because the colour and material run through the full thickness, an impact leaves a mark rather than splitting a face off a core, and there is no exposed edge to lever open.
Can you work during term time if we cannot wait for a break? Yes. We phase block by block so a proportion of washrooms stays available, and we schedule noisy work outside teaching hours where the timetable allows.
Do you supply lockers and changing benches for sports facilities? Yes, from the same panel with matching stainless fittings, so the sports block and the teaching block share one specification and one spares list.
How long does fabrication take for a campus quantity? Eight to twelve working days after layout and colour approval for a multi block package. Colour availability is normally the variable rather than cutting capacity.
What does a compact HPL partition cost in Shorouk City? It depends on thickness, colour, cubicle count and hardware, and volume affects the rate on campus quantities. Send the washroom schedule and we return an itemised quotation.
Get a quote for your Shorouk City project
Send the washroom schedule or the block drawings and we will return an itemised quotation covering the whole programme. If drawings are incomplete we will survey and produce the layouts.
Site visits to Shorouk are planned around term dates and campus access windows. To start the conversation, call or message us any time.
Phone: +201066672094 or +201223111265
Website: cairohouseeg.com
Hours: Open 24 hours, 7 days a week
Address: 3 Misr Lel Tayaran Street, Block 1314, Civil Aviation Buildings, next to Sindbad, El Nozha El Gedida, Cairo 11843
