Compact HPL Partitions in Madinaty, Cairo
Madinaty is large enough to work like a city rather than a compound. The Open Air Mall carries retail and food and beverage across a long spine, Madinaty Golf Club and the Sports Club run full changing facilities, the Craft Zone holds workshops and light commercial units, and the B phases keep expanding with schools and clinics. Cairo House EG supplies and installs compact HPL partitions across every one of those building types.

What compact HPL partitions are, and why Madinaty facilities need them
Compact HPL is high pressure laminate supplied as a solid board. Kraft paper is saturated in phenolic resin and pressed under heat into one dense homogeneous slab, normally 12mm or 13mm for cubicle work. It is self supporting, waterproof through its full thickness and repairable at the fitting rather than the panel.
Madinaty concentrates two of the hardest duties a partition faces into one development. Club changing rooms sit in standing water every day, and mall washrooms take weekend surges that compress a week of use into two evenings. Both destroy systems with an absorbent core, but for different reasons: one through constant saturation, the other through repeated impact at the door edge.
The third factor is maintenance access. Madinaty is managed centrally, which means a facilities team maintains a large stock of similar washrooms. Standardising on one panel and one hardware set across the development lets that team hold a small spares inventory and fix a failed latch the same day rather than waiting on a supplier.


Panel and hardware specification
| Specification | What we supply for Madinaty washrooms |
|---|---|
| Panel thickness | 12mm standard cubicles, 13mm for high traffic and public washrooms |
| Core | Solid phenolic kraft core, waterproof through the full thickness |
| Hardware | Stainless steel 304 hinges, indicator locks, brackets, pilaster shoes, coat hooks |
| Door action | Gravity or spring hinges, self closing, adjustable to open or closed rest |
| Head rail | Anodised aluminium, continuous over the cubicle run |
| Floor fixing | Adjustable stainless feet, levels out uneven screed |
| Typical lead time in Madinaty | Eight to twelve working days after approval |
| Finishes we move most here | Warm woodgrains for retail, hard wearing solids for club facilities |
Where compact HPL earns its cost in Madinaty
Open Air Mall retail
The mall spine runs public washrooms exposed to outside air with weekend surges far above weekday traffic, loading hinges and latches in short bursts.
Golf and sports clubs
Madinaty Golf Club and the Sports Club run changing rooms with wet floors as routine, where lockers and cubicles need the same waterproof panel.
Restaurants and cafes
Food and beverage units along the mall turn over heavily at weekends in compact washrooms with no spare width for a badly cut door.
Schools and nurseries
The schools across the B phases move large groups through washrooms in short breaks, which puts the whole load on door edges and hinges.
Clinics
Medical practices serving the development need seamless non porous surfaces that satisfy hygiene expectations without tiled walls and grout joints.
Craft Zone and light commercial
Workshop and light industrial units run staff washrooms in dusty conditions where a wipe clean non porous panel is the practical choice.

What we supply and install in Madinaty
Cairo House EG has supplied construction finishing materials in Cairo since 2015 and holds the exclusive Egypt agency for UNISCE compact HPL panels. Everything below is fabricated and fitted by our own teams rather than subcontracted out.
Toilet cubicles and urinal screens
Full cubicle runs in 12mm or 13mm compact HPL, with matching urinal divider screens and anodised aluminium head rails. See HPL toilet cubicle panels.
Solid surface vanities
Solid surface vanity units built as one continuous piece, which is the detail that makes a washroom easy to clean. See seamless vanity units.
Corian washroom work
Bathroom surfaces specified where hygiene audits apply and tiled detailing will not pass. See Corian bathroom builds.
Reception and bar counters
Countertops repairable in place, which matters over a five to ten year lease. See custom Corian counters.
Corian table tops
Custom table tops for restaurants and cafes, cut to shape and fitted to your chosen bases. See Corian table tops.
Wet area shower enclosures
Shower cubicles that sit in standing water daily without swelling, because the panel is waterproof through its thickness. See shower enclosures in the same panel.

Serving Madinaty and the eastern corridor
We work from El Nozha El Gedida in Heliopolis, which puts Madinaty a straightforward run out along the Cairo Suez axis. It is far enough that we plan rather than react, agreeing delivery and installation windows before fabrication starts.
On the same corridor we cover Rehab City, Shorouk, Obour, Badr, Mostakbal City and New Cairo. A crew already working the eastern side can reach your site without a separate mobilisation, which keeps costs sensible on smaller packages.
Madinaty has managed gate access and delivery rules. We collect the requirements at survey and submit crew and vehicle details in advance rather than discovering the policy at the gate with a loaded truck. You can also see tailored project solutions.

What to expect when you work with us
Most washroom packages fail at measurement, not installation. Our process removes that risk before a single panel is cut.
- Site survey. We measure the built washroom in Madinaty rather than working from the drawing, because wall plumb, floor level and drainage falls on site rarely match what was issued.
- Layout and panel selection. You receive a cubicle layout with door swings and clear widths marked, plus physical panel samples so the colour is approved under your own lighting instead of on a screen.
- Quotation. Itemised by panel, hardware and installation, so you can see what is being priced and adjust the specification if the budget needs it.
- Fabrication. Panels are cut, edge finished and drilled to the approved layout. Sheets stay under factory film until they reach site.
- Installation. Our fitters set out, install head rails, pilasters and doors, then adjust every hinge and latch before handover. Club and mall work is scheduled inside the access windows the management sets.
- Handover and after sales. We walk the finished washroom with you, hand over spare hardware, and stay reachable for adjustments once the space is in real use.


Find Us on Google Maps
Frequently Asked Questions
Can you standardise one specification across several Madinaty facilities? Yes, and it is worth doing. One panel and one hardware set across the development lets your facilities team hold a small spares stock and replace a failed latch the same day instead of waiting on an order.
Our club changing rooms are wet all day. Will lockers survive? Yes if they are built from the same compact HPL rather than board or steel. The panel is waterproof through its thickness and stainless steel 304 fittings do not corrode, which is the pairing that survives a wet changing room.
Weekend traffic is far heavier than weekdays. Does that change what we should specify? It does. Surge use is harder on hinges and latches than steady traffic. For weekend heavy mall washrooms we specify 13mm panels with self closing hinges rated for public duty.
Can you work within Madinaty gate access and delivery rules? Yes. We collect the access requirements at survey and submit vehicle and crew details in advance so deliveries are scheduled rather than turned away at the gate.
Do you handle school washrooms during term time? Yes, though holidays are easier where the programme allows. Where it does not, we phase block by block so a school is never left without available facilities.
What thickness suits a Madinaty mall washroom? 13mm. Use 12mm for staff only washrooms, small offices and low traffic clinic rooms, where it performs perfectly well and costs less.
Is the stainless hardware supplied with the panels? Yes. Hinges, indicator locks, brackets, pilaster shoes and coat hooks in stainless steel 304 as one matched set, with spares left with your facilities team.
What does a compact HPL partition cost in Madinaty? It depends on thickness, colour, cubicle count and hardware, and volume affects the rate across several facilities. Send the layouts and we return an itemised quotation.
Get a quote for your Madinaty project
Send the washroom layouts or the unit dimensions and we will return an itemised quotation. If you are standardising across several facilities we will price the whole set together.
Site visits to Madinaty are planned around gate access and management windows. To send us your drawings, call or message us any time.
Phone: +201066672094 or +201223111265
Website: cairohouseeg.com
Hours: Open 24 hours, 7 days a week
Address: 3 Misr Lel Tayaran Street, Block 1314, Civil Aviation Buildings, next to Sindbad, El Nozha El Gedida, Cairo 11843
