Compact HPL Partitions in 6th of October City, Cairo
6th of October City combines heavy industry, private universities and large format retail in one plan. Mall of Egypt draws city wide footfall, Dar Al Fouad Hospital anchors the medical side, MSA University and Misr University for Science and Technology move thousands of students daily, and the industrial zone runs staff washrooms at a scale most Cairo districts never see. Cairo House EG supplies and installs compact HPL partitions across all of it.

What compact HPL partitions are, and why October projects specify them
Compact HPL is high pressure laminate manufactured as a solid board rather than a decorative skin over a soft substrate. Kraft paper is saturated in phenolic resin and pressed under heat into one dense homogeneous sheet, normally 12mm or 13mm for cubicle work. There is no core to absorb water and no frame to corrode.
October is a volume district, and volume changes the specification logic. A factory in the industrial zone might run staff washrooms for several hundred workers on shift patterns, which means the cubicles are in use almost continuously. Under that load the panel face is not what fails. Door edges, hinges and latches take the punishment, which is why hardware quality decides the real service life.
The second factor is replacement cost at scale. Refitting one washroom is a nuisance. Refitting forty across a campus or a plant is a capital item. Specifying a panel that lasts fifteen years instead of four is the single largest saving available on a washroom package here, and it costs very little more at the point of purchase.


Panel and hardware specification
| Specification | What we supply for 6th of October washrooms |
|---|---|
| Panel thickness | 12mm standard cubicles, 13mm for high traffic and public washrooms |
| Core | Solid phenolic kraft core, waterproof through the full thickness |
| Hardware | Stainless steel 304 hinges, indicator locks, brackets, pilaster shoes, coat hooks |
| Door action | Gravity or spring hinges, self closing, adjustable to open or closed rest |
| Head rail | Anodised aluminium, continuous over the cubicle run |
| Floor fixing | Adjustable stainless feet, levels out uneven screed |
| Typical lead time in 6th of October City | Eight to twelve working days after approval for programme quantities |
| Finishes we move most here | Hard wearing greys and dark solids for industrial and campus use |
Where compact HPL earns its cost in 6th of October City
Industrial and factories
The October industrial zones run staff washrooms across shift patterns, effectively in continuous use. Hardware that unbolts and swaps in minutes keeps a plant running.
Universities
MSA University, Misr University for Science and Technology and Nile University put large groups through the same washrooms between lectures, loading door edges hardest.
Malls and retail
Mall of Egypt and Hyper One run public washroom floors on continuous cleaning rotas, where a coated finish would strip within a year.
Hospitals
Dar Al Fouad and the surrounding medical facilities need non porous seamless surfaces that take hospital grade disinfectant without degrading.
Media and entertainment
Media Production City and Dream Park handle visitor and crew surges rather than steady traffic, in facilities that must be quick to reset.
Compound clubhouses
Residential compound gyms and clubhouses across October need commercial grade cubicles and lockers even in a residential setting.

What we supply and install in 6th of October City
Cairo House EG has supplied construction finishing materials in Cairo since 2015 and holds the exclusive Egypt agency for UNISCE compact HPL panels. Everything below is fabricated and fitted by our own teams rather than subcontracted out.
Washroom cubicle systems
Cubicle systems built from solid grade board, so the door edge is the same material as the face and cannot delaminate. See HPL compact cubicle panels.
Washroom counter tops
Counter surfaces in the same colour family as the cubicles, so the washroom reads as one specification. See compact counter tops.
Wall cladding
Full height panel cladding for wet walls and corridors, a practical alternative to tile and grout. See panel cladding systems.
Partition hardware
The full fittings set in stainless 304, because plated steel rusts at the fixing points within a year in a humid washroom. See partition accessory range.
Cubicle door hinges
Hinge sets rated for public washroom traffic, supplied with the fixings and spares your maintenance team will want. See door hinge fittings.
Latch hardware
Latch sets that survive constant use and can be swapped out individually rather than as a whole door. See partition lock range.

Serving 6th of October City and the western corridor
We are based in El Nozha El Gedida in Heliopolis, which puts October on the far side of the city. For that reason we handle work here as planned programmes rather than same day callouts, with bulk delivery and phased installation agreed before fabrication starts.
From the same base we cover Sheikh Zayed, Hadayek El Ahram, Haram and Giza on the western side. A contractor running several sites across that corridor can hand us the whole package rather than splitting it.
Industrial and campus sites carry their own access rules, from gate passes and induction to restricted delivery windows and shift working. We collect all of it at survey so the programme we quote is one that survives contact with the site. You can also see work we have delivered.

What to expect when you work with us
Most washroom packages fail at measurement, not installation. Our process removes that risk before a single panel is cut.
- Site survey. We measure the built washroom in 6th of October City rather than working from the drawing, because wall plumb, floor level and drainage falls on site rarely match what was issued.
- Layout and panel selection. You receive a cubicle layout with door swings and clear widths marked, plus physical panel samples so the colour is approved under your own lighting instead of on a screen.
- Quotation. Itemised by panel, hardware and installation, so you can see what is being priced and adjust the specification if the budget needs it.
- Fabrication. Panels are cut, edge finished and drilled to the approved layout. Sheets stay under factory film until they reach site.
- Installation. Our fitters set out, install head rails, pilasters and doors, then adjust every hinge and latch before handover. On factory and campus sites we phase the work block by block so facilities are never entirely out of service.
- Handover and after sales. We walk the finished washroom with you, hand over spare hardware, and stay reachable for adjustments once the space is in real use.


Find Us on Google Maps
Frequently Asked Questions
Can you handle a washroom programme across a whole factory or campus? Yes. Repeat washrooms are the work we are set up for. We fabricate in batches against your phasing schedule rather than producing everything at once and storing it on a live site.
Our staff washrooms are in use across three shifts. How do you install without stopping production? We phase block by block so a proportion of facilities stays available throughout. The sequence gets agreed at survey rather than improvised on site.
What thickness should an industrial staff washroom use? 13mm. Continuous shift use is the hardest duty a cubicle sees, and the thicker board absorbs impact at the door edge far better over a long service life.
Do you supply lockers and benches for changing rooms as well? Yes, built from the same compact HPL panel with matching stainless hardware, so the changing room and the washroom carry one specification and one maintenance routine.
Can you meet gate access, induction and delivery window requirements? Yes. We collect the site rules at survey and submit crew and vehicle details in advance so delivery windows are planned into the programme.
How long does fabrication take for programme quantities? Eight to twelve working days after layout and colour approval for a multi washroom package. Single washrooms turn faster. Colour availability is usually the variable, not cutting capacity.
Is the stainless hardware included? Yes. Hinges, indicator locks, brackets, pilaster shoes and coat hooks in stainless steel 304 as a matched set, with spares left on site so your maintenance team can replace a fitting the same day.
What does a compact HPL partition cost in 6th of October City? It depends on thickness, colour, cubicle count and hardware, and volume affects the rate. Send the layouts or the washroom schedule and we return an itemised quotation.
Get a quote for your 6th of October project
Send the washroom schedule or the floor plans and we will return an itemised quotation covering the whole programme. If drawings are incomplete we will survey and produce the layouts.
Site visits to October are planned around your gate access and shift patterns. To book a site survey, call or message us any time.
Phone: +201066672094 or +201223111265
Website: cairohouseeg.com
Hours: Open 24 hours, 7 days a week
Address: 3 Misr Lel Tayaran Street, Block 1314, Civil Aviation Buildings, next to Sindbad, El Nozha El Gedida, Cairo 11843
