Compact HPL Partitions in the New Administrative Capital, Cairo
The New Administrative Capital is the largest single block of unfinished commercial washrooms in Egypt right now. Government buildings in the Ministries District, towers rising in the CBD around the Iconic Tower, hotels along the Green River and the retail floors going into Downtown MU all need cubicles fitted before handover. Cairo House EG supplies and installs compact HPL partitions across the Capital, working to programme dates rather than around them.

What compact HPL partitions are, and why Capital projects specify them
Compact HPL is high pressure laminate pressed into a solid board rather than a thin decorative skin. Kraft paper is saturated in phenolic resin and fused under heat until the sheet is one homogeneous slab, normally 12mm or 13mm for cubicle work. There is no soft core inside to absorb water, which is the failure most washroom systems eventually suffer.
In the Capital that property is being written into specifications directly. Government and institutional buildings here are procured against written material standards, and consultants are asking for evidence that a partition will survive a decade of public use without refinishing. Compact HPL answers that question on paper as well as on site, because the panel is the same material through its full thickness.
Scale is the second factor. A single ministry floor plate can carry more cubicles than an entire mall washroom programme elsewhere in Cairo. Repetition is the advantage here: one approved cubicle detail, one panel colour, one hardware set, replicated across floors without redesign.


Panel and hardware specification
| Specification | What we supply for Capital washrooms |
|---|---|
| Panel thickness | 12mm standard cubicles, 13mm for high traffic and public washrooms |
| Core | Solid phenolic kraft core, waterproof through the full thickness |
| Hardware | Stainless steel 304 hinges, indicator locks, brackets, pilaster shoes, coat hooks |
| Door action | Gravity or spring hinges, self closing, adjustable to open or closed rest |
| Head rail | Anodised aluminium, continuous over the cubicle run |
| Floor fixing | Adjustable stainless feet, levels out uneven screed |
| Typical lead time in the Capital | Ten to fourteen working days for programme quantities after approval |
| Finishes we move most here | Neutral greys and warm woodgrains for institutional interiors |
Where compact HPL earns its cost across the Capital
Government buildings
The Ministries District runs washrooms that serve staff and visiting public all day. Vandal resistance and one hour hardware replacement matter more than finish detail.
CBD towers
Office towers around the Iconic Tower repeat the same core washroom on every floor, which is the cheapest kind of programme to run once the first detail is signed off.
Hotels and hospitality
Hotels along the Green River and around Al Massa need washroom finishes that photograph well and still clean down on a commercial rota.
Retail and exhibition
Downtown MU and Expo City handle visitor surges rather than steady traffic, which puts short sharp loads on doors and latches.
Sports and education
Sports City and Knowledge City changing rooms deal with standing water daily, where a laminated board would swell within a season.
Residential compounds
R3 and R5 clubhouses and gym blocks need commercial grade cubicles even though the buildings around them are residential.

What we supply and install across the New Administrative Capital
Cairo House EG has supplied construction finishing materials in Egypt since 2015 and holds the exclusive Egypt agency for UNISCE compact HPL panels. Everything below is fabricated and fitted by our own teams.
Compact HPL toilet partitions
Complete partition runs cut to your layout, including urinal screens, head rails and adjustable stainless feet. See our HPL compact partition system.
Cubicle door hinges
Hinge sets rated for public washroom traffic, supplied with the fixings and spares your maintenance team will want. See stainless partition hinges.
Latch hardware
Latch sets that survive constant use and can be swapped out individually rather than as a whole door. See partition latch hardware.
Support brackets
Stainless brackets that carry the panel load into the wall properly, which is where cheap installations usually fail. See wall fixing brackets.
Adjustable pilaster feet
Pilaster shoes that cover the fixing and keep water away from the base of the panel. See levelling pilaster feet.
Hooks and door bumpers
Coat hooks fixed through the panel properly rather than surface stuck, so they survive being leaned on. See cubicle door hooks.

Serving the New Administrative Capital and the eastern corridor
Our base is in El Nozha El Gedida, Heliopolis, which puts the Capital roughly an hour out along the Cairo Suez road depending on the gate you enter through. For programme work we plan deliveries in bulk rather than trickling panels out, so site storage and gate access get agreed before fabrication starts.
Alongside the Capital we cover Mostakbal City, Badr City, Shorouk, Madinaty and New Cairo on the same corridor, which means a team already working the eastern side can reach your site without a separate mobilisation.
Capital sites carry access rules that other Cairo projects do not, from security clearance for crews to restricted delivery windows. We handle that at survey stage so the programme you are given is one we can actually hold. You can also see our supply and installation service.

What to expect when you work with us
Most washroom packages fail at measurement, not installation. Our process removes that risk before a panel is cut.
- Site survey. We measure the built shell across the Capital floor plates rather than working from the drawing, because new concrete rarely matches the issued dimensions.
- Layout and panel selection. You receive a cubicle layout with door swings and clear widths marked, plus physical samples so colour is approved under your own lighting.
- Quotation. Itemised by panel, hardware and installation so a consultant can review the specification line by line.
- Fabrication. Panels are cut, edge finished and drilled to the approved layout, staying under factory film until they reach site.
- Installation. Our fitters set out, install head rails, pilasters and doors, then adjust every hinge and latch before the floor is signed off.
- Handover and after sales. We walk each washroom with you, leave spare hardware on site, and stay reachable once the building is occupied.


Find Us on Google Maps
Frequently Asked Questions
Do you handle programme quantities for a full Capital building? Yes. Repeat floor plates are the work we are set up for. We fabricate in batches against the floor release schedule rather than producing everything at once and storing it on a live site.
How do you deal with security clearance and gate access in the Capital? We collect the access requirements at survey stage and submit crew and vehicle details in advance. Delivery windows get built into the programme instead of being discovered on the day.
What thickness should a government building washroom use? 13mm. Public washrooms in institutional buildings take continuous use and the thicker board absorbs impact at the door edge far better over a ten year horizon.
Can you match a consultant specified colour and provide documentation? Usually yes. We supply panel samples and product documentation for submission. If a named colour sits outside the UNISCE range we say so before you commit rather than substituting quietly.
Is the hardware included or specified separately? Included. Hinges, indicator locks, brackets, pilaster shoes and coat hooks are supplied as one matched stainless steel 304 set, with spares handed over at completion.
How long does fabrication take once the layout is approved? Ten to fourteen working days for programme quantities. Single washrooms turn faster. The variable is colour availability, not cutting time.
Do you install while other trades are still working on the floor? We prefer to go in near the end. Panels are the finish item, and installing them early means they take damage from trades that follow. We plan the sequence with the main contractor.
What does a compact HPL cubicle cost in the Capital? It depends on thickness, colour, cubicle count and hardware. Send the layout or the floor plate and we return an itemised quotation rather than a rate that moves later.
Get a quote for your New Administrative Capital project
Send the washroom layout or the floor plate and we will return an itemised quotation. If drawings are not issued yet we will survey and produce the layout ourselves.
Site visits to the Capital are arranged around your access windows. To contact us to arrange a survey, call or message us any time.
Phone: +201066672094 or +201223111265
Website: cairohouseeg.com
Hours: Open 24 hours, 7 days a week
Address: 3 Misr Lel Tayaran Street, Block 1314, Civil Aviation Buildings, next to Sindbad, El Nozha El Gedida, Cairo 11843
